KCC expects the cost to be recouped by 2029.
Energy up-grades to Kildare's Fire Stations are costing €250,000.
The stations are in Naas, Newbridge, Athy, Monasterevin, Maynooth and Leixlip.
Kildare County Council says the heating systems are being brought up to date, solar panels are being installed, and lighting and insulation improved.
The total cost of the works, according to the 2020 annual report, has a "payback time ranging up to 8 years".

Woman Hospitalised Following Single Vehicle Crash In Athy, Near Nicholastown
Kildare Among Top Counties For Animal Welfare Complaints – New Figures Show
Call For Maynooth University To Address Student Parking Overflow Impacting Nearby Estates
Drivers Still Dodging Penalty Points By Donating To "Poor Box"
Catherine Connolly Sworn In As 10th President Of Ireland
Father Warns Parents To Have Conversations With Their Children After Son’s Aerosol-Related Death
Kildare Childcare Places At Risk As Home Childminders Face Possible Commercial Rate Charges
Localised Flooding Causing Disruption In Kildare Town